INDUSTRY/COMPANY:
Bulk Material Handling
TYPE:
Infrastructure
OWNER:
Westshore Terminals
LOCATION:
Delta, British Columbia
CONSTRUCTION TERM:
2 weeks (24/7 Shutdown) following 1 month pre-planning
Project Features Include:
- Received, assembled and installed new 1,100T shiploader
- Assisted with removal of existing shiploader & tripper
- Installed/integrated new tripper with existing berth conveyor
- Connected the mechanical, hydraulic & electrical components, including structural/hydraulic modifications to rotating loading spout
- Assisted with 12,000 TPH shiploader commissioning, achieving commercial operation within 14 days