Project Overview
FWS was engaged to design and construct a state-of-the-art metakaolin processing plant in Wood Mountain, Saskatchewan. The facility was developed to meet the growing demand for high-quality metakaolin, with a focus on high-capacity production, operational efficiency, and environmental compliance. The project involved complete infrastructure development, equipment installation, and integration of advanced processing technologies.
Project Goals
The goal of this project was to create a state-of-the-art processing facility capable of producing up to 200,000 tonnes of metakaolin annually. The plant was designed to support large-scale operations while ensuring operational efficiency, adherence to environmental regulations, and the long-term durability of the infrastructure.
Technologies and Innovations
Key features of the Metakaolin Processing Plant include:
- Processing Capacity: The facility is designed to handle up to 200,000 tonnes of metakaolin annually, allowing for large-scale production to meet both industrial and commercial demands.
- Foundations and Structural Elements: Extensive design and installation of concrete foundations and structural steel, creating a robust base for the plant’s infrastructure, ensuring stability and durability.
- Processing Equipment Installation: The plant is equipped with a variety of processing equipment, including:
- Primary Crusher: For initial ore reduction.
- Ore Handling Equipment: To efficiently transport and manage ore throughout the process.
- Rotary Dryer/Kiln/Cooler: For drying, calcining, and cooling metakaolin.
- Mechanical Separator: For separating metakaolin based on physical properties.
- Baghouse and Stack: For dust collection and emissions control.
- Secondary Dust Collectors: To capture additional dust.
- Coal Mill: For grinding coal used in the kiln.
- Ore Conditioner: To prepare ore for processing.
- Ore and By-Product Bins: For storing processed materials and by-products.
- Truck Scale and Loading Facility: For accurate measurement and efficient loading of finished products.
Results
The completed plant delivers high-volume, high-efficiency metakaolin production, supporting the industrial and commercial markets. The integration of emissions controls and sustainable design features ensures compliance with regulatory requirements, while the robust infrastructure supports long-term operations and future scalability.
This project highlights FWS’s capacity to deliver large-scale industrial facilities that combine advanced processing technologies with environmental stewardship and operational resilience.