Shiploader Installation

INDUSTRY/COMPANY: Bulk Material Handling
TYPE: Infrastructure
OWNER: Westshore Terminals
LOCATION: Delta, British Columbia
CONSTRUCTION TERM: 2 weeks (24/7 Shutdown) following 1 month pre-planning
  • Shiploader_delta BC engineer design
  • Shiploader_delta BC engineer design crane
  • Shiploader_delta BC engineer design
  • Shiploader_delta BC engineer design shiploader engineering build
  • Shiploader_delta BC engineer design ship loadeing crane
  • sunshine Shiploader_delta BC engineer design
Project Features Include:
  • Received, assembled and installed new 1,100T shiploader
  • Assisted with removal of existing shiploader & tripper
  • Installed/integrated new tripper with existing berth conveyor
  • Connected the mechanical, hydraulic & electrical components, including structural/hydraulic modifications to rotating loading spout
  • Assisted with 12,000 TPH shiploader commissioning, achieving commercial operation within 14 days