Shiploader Installation

INDUSTRY/COMPANY: Bulk Material Handling
TYPE: Mechanical/ Retrofits
OWNER: Westshore Terminals
LOCATION: Delta, British Columbia - Canada
CONSTRUCTION TERM: 2 weeks (24/7 Shutdown) following 1 month pre-planning
Project Features Include:
  • Received, assembled and installed new 1,100T shiploader
  • Assisted with removal of existing shiploader & tripper
  • Installed/integrated new tripper with existing berth conveyor
  • Connected the mechanical, hydraulic & electrical components, including structural/hydraulic modifications to rotating loading spout
  • Assisted with 12,000 TPH shiploader commissioning, achieving commercial operation within 14 days