Integrated Ethanol Facility

INDUSTRY/COMPANY: Ag-Industrial
TYPE: Process Plants
OWNER: North West Terminal Construction
LOCATION: Unity, Saskatchewan
CONSTRUCTION TERM: 19 months
Project Features Include:
  • 25 Million litre ethanol processing
  • Integrated grain utilitzation systems with existing high throughput elevator
  • Integrated bio-mass boiler