PROJECT DESCRIPTION
The scope of work included:
• Flex piping at wellhead
• 3” produced emulsion (PE) line
• 3” produced gas (PG) line
• Line insulation and electronic heat trace EHT requirements in design
• Metering on PE and PG lines, as per regulatory requirements
• Emergency shut down valve (ESDV) and pressure control valve (PCV) on PG line
• Various indicators on both lines, pressure indicator transmitter (PIT), temperature measuring element/thermocouple (TE) and temperature indicator transmitter (TIT)
• Vents and drains, chemical injection valves, and tie-ins
• Technical Safety Authority of Saskatchewan design registration